Spotsylvania County Utilities general requirements for water meter sets are as follows:

  • Meter barrel must be graded to 2 inches from the final grade
  • Meter yoke/setter must be 18 inches to 22 inches deep from the top of the lid
  • Meter yoke/setter must have 4 inches to 6 inches clearance under the yoke/setter
  • Corresponding sewer lateral must pass Sanitary Sewer Lateral Inspection
  • Spotsylvania County Utilities Engineering and Construction division must have all required project documents (i.e. as-built plans, cost estimates, and passing bacteriological tests, etc.)
  • Record of payment in full for tap fees, meter fees, connection costs, inspection fees, etc.

The list above is provided to be used as general guidelines and there may be other requirements. Refer to your specific standard approved plans for detailed water meter, meter vault, and service line requirements. For more information with regard to water and sewer design and construction, please click on this link to access the Spotsylvania County Utilities Water and Sewer Design and Construction Standards Manual.